How To Regenerate The X-Ray Generators - Smiths detection HI-SCAN 5170-A User Manual

Conventional x-ray inspection units hi-scan with hitrax electronics
Table of Contents

Advertisement

How to regenerate the X-ray generators*

(applies only to X-ray units with 300kV X-ray generators*)
If the X-ray unit is equipped with 300kV X-ray
generators*, the generators have to be regener-
ated provided that more than 72 hours have
passed after the last operation. After that period
the window illustrated appears when switching
on the X-ray unit.
 If any freight items are still placed on the conveyors, do not start the regeneration, but abort the process
s
with
.
 To convey the freight items back, move the conveyors in reverse direction with
S
Attention!
Units with newer software* may be set in a way that the keys
pressed briefly or have to be kept depressed (according to the arrow symbols in the screen indica-
tion field (F 1-25))! In the latter case the unit can also be set so as to stop the conveyors only after
up to 3 seconds after the key is released! An immediate conveyor stop is possible with
 If you are going to unload a freight item, stop the conveyors with
 When you have unloaded all freight items in the manner described, press shortly the key
pointing into the scanning direction. With that the conveyors are not started, but the window illustrated
above displayed again.
r
 Confirm with
. The conveyors are started and the
X-ray generators are automatically regenerated with re-
duced high tension. During the process of 18 minutes
the window illustrated is displayed.
I
After longer break times it may happen that the regeneration must be prolonged because of tech-
nical reasons. In this case the Remaining time will be automatically reset to 18 minutes.
95587412 01/01/09 © Smiths Heimann
How to start and terminate your work
m
or
n
m
and
either have to be
1
.
n
.
1
!
770
m
n
or
1-39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents