Maintenance Schedule - Rotax 915 i A SERIES Maintenance Manual

Hide thumbs Also See for 915 i A SERIES:
Table of Contents

Advertisement

Perform the following maintenance tasks at the intervals shown in the maintenance check list.
See
Chapter 05-20-00 section 25 hr.
Legend:
N N O O T T E E
If the points 1-4 are correct of the check list then to continue with the maintenance schedule.
If one of the points 1-4 is not fulfilled, the engine must be checked and repaired in accordance with
the BRP-Rotax instructions for continued airworthiness.
Points of Inspection
* no periodic maintenance (require-
ment after the first 25 hours of
operation)
All (Alert) Service Bulletins are com-
plied with. If necessary to perform
these and documented.
All SI-PAC (Service Instruction Part
and Accessories) for additional GENU-
INE-ROTAX®- parts and accessories
used on the relevant aircraft are com-
plied with. If necessary to perform
these and document it.
Check the compression by the differen-
tial pressure method.
Test pressure________hPa (psi)
Pressure drop (% or fraction)
Cyl. #
1
2
bar/
psi
(2
use of leaded fuel more than 30% of
operation
05–20–00
Page 8
December 01 2017
MAINTENANCE MANUAL

MAINTENANCE SCHEDULE

check.
=
X
do the task
=
blank
no task required
25*
1) General note
X
X
2) Differential pressure check
3
4
BRP-Rotax
Interval Operating hours
50
100
200
600
X
X
X
X
X
X
X
X
X
(2
X
X
Chapter
Reference
1000
X
X
X
12–20–00
Checking the
compression
Effectivity: 915 i A Series
Edition 0/Rev. 0
Signa-