Rotax 915 i A SERIES Maintenance Manual page 60

Hide thumbs Also See for 915 i A SERIES:
Table of Contents

Advertisement

Points of Inspection
* no periodic maintenance (require-
ment after the first 25 hours of
operation)
Read out the ECU fault memory (fault
and data logs).
Check the FUSE BOX and its
mounting.
Visual inspection of the fuses.
Check the wastegate lever for free run-
ning and correct position
Lubricate the wastegate lever.
Check gear set (pittings)
Check wear on tooth of overload
clutches
Check slipping torque of all 3 overload
clutches
Check wear on the intermediate shaft
Change torsion shaft
05–20–00
Page 12
December 01 2017
BRP-Rotax
MAINTENANCE MANUAL
Interval Operating hours
25*
50
100
X
X
10) FUSE BOX
X
X
11) Checking the wastegate lever
X
X
X
X
12) Checking the propeller gear box
Reference
200
600
1000
12–20–00
Read out the
X
12–20–00
Turbocharger
12–20–00
Turbocharger
X
See Heavy
Maintenance
72–10–00
X
See Heavy
Maintenance
72–10–00
X
See Heavy
Maintenance
72–10–00
X
See Heavy
Maintenance
72–10–00
X
See Heavy
Maintenance
72–10–00
Chapter
Signa-
ture
ECU data
memory
Chap.
Chap.
Chap.
Chap.
Chap.
Effectivity: 915 i A Series
Edition 0/Rev. 0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents