Executing An Individual Test; Selecting A Test; Running The Test - Keithley 4200-SCS User Manual

Semiconductor characterization system
Hide thumbs Also See for 4200-SCS:
Table of Contents

Advertisement

Model 4200-SCS User's Manual

Executing an individual test

Selecting a test

An enabled (check marked) ITM or UTM is selected by clicking the test in the project navigator
(see
and ready to be run. Also, the selected-test name is displayed in the Test / Plan Indicator box
located above the project navigator.
The test can also be selected by double-clicking it in the project navigator. The double-click action
places the appropriate ITM or UTM window in the KITE workspace. The ITM and UTM definition
tabs show the test configurations.
NOTE

Running the test

To run a selected test:
1.
2.
While the test is running, test data is placed the data sheet. In ITMs data is placed in the data
sheet real time as data is being acquired. In UTMs by default, data is not placed in the data sheet
until after the test has finished running.
In the message area of the KITE window, time stamps indicate:
NOTE
For detailed information about running individual tests, see
individual tests and test sequences, page
1. For details about using the ITM and UTM definition tabs, see
page
4200-900-01 Rev. K / February 2017
Figure
2-14). The Run Test / Plan button
Before executing a test for which data must be labeled with a specific site number,
refer to the
Reference Manual, Assigning a site-number label to individual test and
test-sequence data, page
Click the green Run Test / Plan button
Select Run in the Run menu, or press the F6 keyboard key.
Start time
Stop time
Total execution time
You can also start a test by pressing the F6 keyboard key. You can abort a test by
clicking the red Abort Test / Plan toolbar button, by selecting Abort in the Run menu,
or by pressing the PAUSE / BREAK keyboard key.
6-86, and
Configuring the UTMs on page
Return to
Section 2: Model 4200-SCS Software Environment
turns green to indicate that the test is enabled
*1
See
Figure 2-4
and
6-30.
6-162.
Reference Manual, Configuring the Project Plan ITMs,
6-142.
Section Topics
Figure
2-5.
Reference Manual, Run execution of
2-23

Advertisement

Table of Contents
loading

Table of Contents