Executing Subsite Cycling; Subsite Cycling Data Sheets; Multiple Subsite Cycling; Cycle Mode Data Sheet - Keithley 4200-SCS User Manual

Semiconductor characterization system
Hide thumbs Also See for 4200-SCS:
Table of Contents

Advertisement

Model 4200-SCS User's Manual

Executing subsite cycling

With the Subsite Plan in the project navigator selected and enabled, subsite
cycling is started by clicking the Run Test/Plan and Cycle Subsites button (see
Figure
Figure 3-72
Starting subsite cycling

Multiple subsite cycling

If two or more subsites are configured for subsite cycling, they can all be run
consecutively. When the first subsite is finished cycling, the next subsite will start
automatically.
Multiple subsite cycling is started from the project level, rather than the subsite
level. In the project navigator, select and enable the Project and then start cycling
as shown in

Subsite cycling data sheets

Spreadsheet Data for the Subsite Plan is acquired in the Subsite Data sheet. With
the Subsite Plan opened in the workspace, the data sheet is displayed by clicking
the Subsite Data tab.

Cycle Mode data sheet

Figure 3-73
Column A lists the cycles that were run. For the example in
cycles were run. Columns B, C, D and E lists the readings for the four Output
Values.
4200-900-01 Rev. K / February 2017
3-72):
• If the Cycle Mode is selected for subsite cycling, all cycles of the Subsite Plan will run.
• If using the Stress / Measure Mode is being used and there are enabled Targets, the
Subsite Plan will terminate when all enabled Targets are reached.
• Otherwise, all cycles of the Subsite Plan will run.
Click Run Test/Plan and Cycle Subsites button to start subsite cycling.
Figure
3-72.
shows an example data sheet for a Subsite Plan that has one device.
Return to
Section 3: Common Device Characterization Tests
Section Topics
Figure
3-73, four
3-91

Advertisement

Table of Contents
loading

Table of Contents