Mitsubishi Q01CPU User Manual page 268

Melsec-q series, qcpu
Hide thumbs Also See for Q01CPU:
Table of Contents

Advertisement

10
LOADING AND INSTALLATION
10
- 24
10.3 Module Installation
10.3.3 Installation and removal of module
POINT
1. When mounting the module, always insert the module fixing projection into
the module fixing hole of the base unit.
At that time, securely insert the module fixing projection so that it does not
come off from the module fixing hole.
If the module is forcibly mounted without the latch being inserted, the module
connector and module will be damaged.
2. When using the programmable controller in a place where there is large
vibration or impact, screw the CPU module to the base unit.
Module fixing screw : M3 X 12 (user-prepared)
3. Do not mount/remove the module onto/from base unit or terminal block more
than 50 times (IEC 61131-2 compliant), after the first use of the product.
Failure to do so may cause the module to malfunction due to poor contact of
connector.
(b) Removal from Q3 B, Q3 SB, Q3 RB, Q3 DB, Q5 B, Q6 B, Q6 RB,
and Q6 WRB
Support the module with both
hands and securely press the
module fixing hook(*1) with your
finger.
Pull the module based on the
supporting point of module bottom
while pressing the module fixing
hook (*1).
While lifting the module, take off
the module fixing projection (*2)
from the module fixing hole.
Completed
* 1: If the module has two module fixing hooks on its top, push the two modules fixing projections on
the right and left of the module top simultaneously with your fingers until they stop.
Module fixing
hook
Module
connector
Unit/Module
Diagram 10.25 Module removal procedure
Push
Lifting
1
Base unit
Module fixing hole

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents