Mitsubishi Q01CPU User Manual page 265

Melsec-q series, qcpu
Hide thumbs Also See for Q01CPU:
Table of Contents

Advertisement

10
LOADING AND INSTALLATION
4
17 mm (0.67 inch) or more 2, 6
(2) Module mounting orientation
(b) In case of slim type main base unit
Indicates the panel top, wiring duct or any
part position.
5, 6
5mm (0.20 inch) or more 6
* 1: For wiring duct with 50mm (1.97 inch) or less height.
40mm (1.58 inch) or more for other cases.
* 2: The cable of the power supply module of the slim type main base unit protrudes out of the left end
of the module. Install the module while reserving 17mm (0.67 inch) or more wiring space.
If the cable sheath is susceptible to damage caused by a structural object or part on the left side
of the module, take a protective measure with spiral tube or a similar insulator.
* 3: 80mm (3.15 inch) or more for the connector type. 80mm (3.15 inch) or more for installing the
Q8BAT cable when using the Q8BAT.
* 4: 45mm (1.77 inch) or more when the Q7BAT is mounted.
* 5: 30mm (1.18 inch) or more from the top and bottom of the Q8BAT when the Q8BAT is mounted.
* 6: 5mm (0.20 inch) or more from the right and left of the Q8BAT when the Q8BAT is mounted.
Diagram 10.19 Module mounting position
• Install the programmable controller in the orientation in Diagram 10.20 to ensure
good ventilation for heat release.
Diagram 10.20 Orientation in which modules can be mounted
• Do not mount it in either of the orientations shown in Diagram 10.21.
Vertical mounting
Diagram 10.21 Orientation in which modules cannot be mounted
30mm (1.18 inch)
or more
1, 5
Panel
30mm (1.18 inch)
or more
4, 5
Horizontal installation
10.3 Module Installation
10.3.2 Instructions for mounting the base unit
Programmable
controller
Door
20mm
(0.79 inch)
or more
3
10
- 21
9
10
11
12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents