Suggested Setup For Heater Operation Test; Wiring Connections For Heater Operation Test - Piper Navajo Chieftain PA-31-350 Service Manual

Hide thumbs Also See for Navajo Chieftain PA-31-350:
Table of Contents

Advertisement

391
FUEL IN
(FROM PUMP)
NAVAJO CHIEFTAIN SERVICE MANUAL
1. COMBUSTION
AIR MANOMETER
2. COMBUSTION
AIR PRESSURE SWITCH
3. VENT AIR BLOWER
4. DRAIN
5. TERMINAL
STRIP
6. HEATER
7. COMBUSTION
AIR BLOWER
-
24" MIN.
/7
6" APPROX.
-
.10
8. VENTILATING
AIR MANOMETER
9. THERMOMETER
10. OVERHEAT
(LIMIT)
SWITCH
11. CYCLING
SWITCH
12. EXHAUST
OUTLET
13. DUCT
14. DUCT SWITCH
2.25" DIA. ORIFICE
3
28 V
12
Figure 13-19. Suggested Setup for Heater Operation Test
C490
IGNITION
UNIT
16
CYCLING
HEATER
CIRCUIT
COMBUSTION AIR
PRESSURE SW
202- 6
FUEL
VALVE
R
N
FILTER
Figure 13-20. Wiring Connections for Heater Operation Test
Reissued: 9/23/80
HEATING AND VENTILATING SYSTEM
4 C18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents