10
–
Secure engine/gearbox unit in the engine and gear-
box mount -arrows- and tighten the screws to the indi-
cated tightening torque ⇒ 10-1 page 7.
–
Position the vent hose for the coolant reservoir on the
ventilation tube and draw together with retaining clips.
–
Position the vacuum hose of the brake servo unit and
draw together with retaining clips.
–
Connect the fuel feed line to the fuel rail.
–
Fit the hose of the vent line to the throttle valve and
draw together with retaining clips.
–
Connect the hoses to the coolant regulator housing:
♦
Heater intake hose
♦
Hose of the expansion reservoir
♦
Heater return-flow hose
–
Screw on earth strap of the gearbox.
Vehicles fitted with a manual gearbox
–
Installing the master cylinder ⇒ Gearbox 02T;
Rep. Gr. 30.
–
Installing the control cables of the gearshift mecha-
nism ⇒ Gearbox 02T; Rep. Gr. 34.
Vehicles with automatic gearbox
–
Check attachment of the torque converter.
–
Install or adjust selector lever tension rod to the gear-
box ⇒ Automatic Gearbox 001; Rep. Gr. 37.
Continued for all vehicles
–
Pull in wiring loom and connect the ten-pin plug con-
nection in left of engine compartment.
–
Connect the plug connection for the engine control
unit.
–
Connect the starter plug connection.
–
Install the lock carrier ⇒ Body Work; Rep. Gr. 50.
Vehicles with air conditioning
Note
To avoid damaging the condenser, wiring and air condi-
tioning hoses make sure the lines and hoses are not ex-
cessively expanded, buckled or bent.
–
Install AC compressor ⇒ Heating, Air Conditioning;
Rep. Gr. 87.
–
Connect the AC compressor plug connection.
–
Install the V-ribbed belt ⇒ Chapter 13-1.
Continued for all vehicles
–
Connect the following plug connections:
10-1
6
page
FABIA 2000
1.4/55; 1.4/74 Engine - Mechanical Components
A
B
Removing and Installing Engine
S10-0109
S10-0111
Edition 09.03
S00.5306.04.20