GE Grid Solutions
Boot Test Verification
Connect to
the
WESMAINT
port
Step
1
2
3
4
5
iBox Boot Up
The iBox automatically boots as soon as the power is turned on.
If the iBox fails to boot up, it may have sustained damage during shipping. Contact
GE Digital Energy for assistance.
GE Information
, continued
Connect a WESMAINT cable to the female DB-9 WESMAINT port on
the top left side of your iBox.
Attach the other end of the WESMAINT cable to the PC's selected
communications port.
Verify the power cable is properly connected to iBox, and power is
available.
The POWER and RUN indicators on the front upper left-hand corner
illuminate when power to the iBox is turned ON.
Monitor the VT100 terminal's display
Result: A series of text scripts displays as the POST routines are
performed. If you do not see the text scripts, check all
connections and repeat the procedure.
Installation and Maintenance Guide
Action
994-0047-5.10-4
iBox/iBox Kit
49