GE iBox Installation And Maintenance Manual page 48

Grid solutions
Table of Contents

Advertisement

iBox/iBox Kit
Installation and Maintenance Guide
Boot Test Verification
System
The iBox software includes a Power On Self-Test (POST) process, which runs when
Diagnostics
the unit is powered ON and determines whether or not the iBox circuitry is working
(POST)
properly.
Terminal
Terminal emulation software is not part of the iBox system, but you can use terminal
Emulation
emulation software such as HyperTerminal
Software
tests.
WESMAINT
Use the following procedure to set up a PC as a WESMAINT terminal:
Terminal for
Step
Set-up
1
2
48
Open HyperTerminal (provided with Windows
other VT100-compatible terminal emulation software.
Verify (or set) the terminal communications settings as follows:
Data Rate
9600 bps
Data Bits
8
Stop Bits
1
Parity
None
Flow Control
XON/XOFF
Connector Settings
COM1, COM2, as required
for your computer
994-0047-5.10-4
GE Grid Solutions
®
or SGConfig terminal utility for these
Action
®
operating system), or
Continued on next page
GE Information

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ibox kit

Table of Contents