GE iBox Installation And Maintenance Manual page 30

Grid solutions
Table of Contents

Advertisement

iBox/iBox Kit
Installation and Maintenance Guide
Physical Mounting
Procedure:
Step
Mounting the
1
iBox
2
3
Mounting and
Leave at least one rack unit (RU) of space above and below the equipment to allow
Clearance
for cooling air flow and cable routing (1 RU = 1.75 inches or 44.5 mm).
30
Align the iBox in its proper position on a flat mounting surface.
Install and tighten the four screws, holding the iBox firmly in place on
the mounting surface.
Loosen the iBox top cover and remove the battery "PULL" tab. The
iBox is delivered with this tab in place to insulate the battery during
shipment.
994-0047-5.10-4
GE Grid Solutions
Action
GE Information

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ibox kit

Table of Contents