2.4. Testing your iBox

Overview
Introduction
This section describes a number of system checks that you can perform to verify
your iBox software is functioning properly.
Valid
Before performing any of the tests in this section, you must have a valid
Configuration
configuration file loaded into the iBox's NVRAM. The iBox is typically shipped
File Required
with a valid configuration file loaded during manufacturing, and this file should be
still loaded when the unit is delivered to your site.
In the event that you do not have a valid configuration file loaded into your iBox's
NVRAM, or the file becomes corrupted before the unit is installed, you must reload
the file before performing these verification tests.
For help restoring your configuration file, refer to the online help in SGConfig.
GE Information
Installation and Maintenance Guide
994-0047-5.10-4
iBox/iBox Kit
45

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the iBox and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Ibox kit

Table of Contents

Save PDF