Appendix F: Installing And Connecting Dnp3 I/O Modules - GE iBox Installation And Maintenance Manual

Grid solutions
Table of Contents

Advertisement

GE Grid Solutions
Appendix F: Installing and Connecting
DNP3 I/O Modules
This Appendix describes how to install and connect DNP3 I/O modules, and connect to the iBox.
For more details on the DNP3 I/O module, refer to the 994-0085 Installation and Maintenance Guide.
Overall Procedure to Install and Connect DNP3 I/O Modules
To install and connect DNP3 I/O modules:
1. Configure the DNP3 DCA in the iBox so that it communicates with your DNP3 I/O module.
Refer to section: Configuring the iBox to work with a DNP3 I/O Module on page 43.
2. Physically locate and mount DNP3 I/O module in a 19 inch rack or cabinet.
Refer to section: Installing DNP3 I/O Modules in a Rack on page 164.
3. Connect the DNP3 I/O module to site ground.
Refer to section: Connecting to Protective Ground on page 165.
4
Interconnect the DNP3 I/O modules and connect power:
For low voltage DNP3 I/O, refer to section: Connecting DNP3 I/O Modules (Low Voltage) on
page 166.
For high voltage DNP3 I/O where connection is made to an external power supply, refer to
section: Connecting DNP3 I/O modules (High Voltage) on page 167.
5
Turn power on to the module, and test it to make sure it is functioning properly.
It is recommended that you complete the above procedure before connecting and testing your field
wiring.
GE Information
Installation and Maintenance Guide
994-0047-5.10-4
iBox/iBox Kit
163

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ibox kit

Table of Contents