Positioning The Boiler; Hydraulic Connections; Flushing The System - REMEHA Quinta Pro 30 Installation And Service Manual

Wall-hung gas condensing boilers
Hide thumbs Also See for Quinta Pro 30:
Table of Contents

Advertisement

4. Installation
4.4

Positioning the boiler

1
2
3
4
5
4.5

Hydraulic connections

20
The boiler is delivered with a mounting template.
A suspension clamp situated at the rear of the casing enables the
boiler to be directly suspended on the mounting bracket.
1. Stick the mounting template to the wall with adhesive tape.
CAUTION
4
4
2. Drill 2 holes with a Ø of 10 mm.
Additional holes are provided in case one or other of the
standard locating holes prevents the correct location of the
plugs.
3. Place the 2Ø 10 mm plugs.
4. Attach the mounting bracket to the wall with the Ø 10 mm bolts
provided.
5. Hang the boiler on the mounting bracket.
T001540-A
4.5.1.

Flushing the system

Using a spirit level, check that the mounting axis is
perfectly horizontal.
During mounting, cover up the connection points for
the air supply and the combustion gas exhaust, to
protect the boiler and its connections from dust. Only
remove this protection at the time when these
connections are made.
Quinta Pro 45 - 65 - 90 - 115
080310 - 123157-AA

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Quinta pro 90Quinta pro 115Quinta pro 45Quinta pro 65

Table of Contents