4. Installation
22
4.5.2.
1. Remove the anti-dust plug located on the heating outlet
connection { under the boiler.
2. Connect the heating water outlet pipe to the heating flow
connection.
3. Install a filling and drainage valve on the installation for filling and
draining the boiler.
T002856-A
4. Remove the anti-dust button located on the heating return
connection z under the boiler.
5. Connect the heating water inlet pipe to the heating return
connection.
6. Fit the pump in the inlet pipe. For the electrical connection of the
pump, see chapter: ¼ "Connecting the pump", page 32
T002857-A
To facilitate maintenance work, we recommend mounting
a shut off valve on the heating flow and return pipes.
CAUTION
4
4
4

Hydraulic connection of the heating circuit

The heating pipe must be mounted in accordance
with prevailing provisions.
If installing shut off valves, position the filling/
drainage valve and the opened expansion vessel
between the shut off valves and the boiler.
When installing open vented systems, the cold feed
and expansion tank heights must comply with the
requirements laid down in the Health and Safety
Executive publication PM5. The Quinta Pro boilers
require a minimum static head of 3 (Quinta Pro
45/65/90) or 5 (Quinta Pro 115) m.
Quinta Pro 45 - 65 - 90 - 115
080310 - 123157-AA