4. Installation
4.6
Gas connection
4.7
Connections for the air and exhaust pipes
24
1. Remove the anti-dust plug from the GAS/GAZ gas inlet pipe under
the boiler.
2. Connect the gas inlet pipe.
3. Mount a gas shut off valve on this pipe, directly under the boiler.
4. Connect the gas pipe to the gas shut off valve.
T002859-A
WARNING
4
4
4
CAUTION
4
4
4
¼ The boiler is suitable for connection to the following
types of combustible gases. See chapter: "Certifications",
page 7
4.7.1.
Classification
The table specifies this classification in detail according to [.
Close the main gas valve before starting work on the
gas pipes.
Before mounting, check that the gas meter has
sufficient capacity. To do this, you should bear in
mind the consumption of all domestic appliances.
If the gas meter has too low a capacity, inform the
local energy supply company.
Ensure that there is no dust in the gas pipe. Blow into
the pipe or shake it before mounting.
We recommend installing a gas filter on the gas pipe
to prevent clogging of the gas valve unit.
Connect the gas pipe in accordance with prevailing
standards.
Quinta Pro 45 - 65 - 90 - 115
080310 - 123157-AA