Installation; General; Preparation; Positioning The Boiler - REMEHA Quinta Pro series Installation, User And Service Manual

Wall-hung gas condensing boilers
Hide thumbs Also See for Quinta Pro series:
Table of Contents

Advertisement

6

Installation

6.1

General

6.2

Preparation

Fig.7
Mounting the boiler
1
2
3
4
5
6.3

Water connections

123157 - v.06 - 24022015
Warning
The boiler must be installed by a qualified installer in accordance
with local and national regulations.

6.2.1 Positioning the boiler

The fitting bracket on the back of the casing can be used to mount the
boiler directly on the suspension bracket.
The boiler is supplied with a mounting template.
1. Attach the mounting template of the boiler to the wall using adhesive
tape.
Warning
Use a level to check whether the mounting template is hanging
perfectly horizontally.
Protect the boiler against building dust and cover the connection
points for the flue gas outlet and air supply. Only remove this
cover to assemble the relevant connections.
2. Drill 2 holes of Ø 10 mm.
Note
The extra holes are intended for use in the event that one of the
two fastening holes is not suitable for correct fastening of the plug.
3. Fit the Ø 10 mm plugs.
4. Attach the suspension bracket to the wall with the Ø 10 mm bolts
supplied.
5. Mount the boiler on the suspension bracket.
AD-0000018-01

6.3.1 Rinsing the system

The installation must be cleaned and flushed in accordance with BS 7593
(2006).
Before a new CH boiler can be connected to an existing or new installa­
tion, the entire installation must be thoroughly cleaned and flushed. This
step is absolutely crucial. The flushing helps to remove residue from the
6 Installation
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents