Positioning The Boiler - REMEHA Calenta 25s Installation And Service Manual

High-efficiency wall-hung condensing gas boilers
Table of Contents

Advertisement

Calenta 25s - 28c - 35s - 40c
4.4

Positioning the boiler

1
2
3
4
5
040412 - 7600585-01
The boiler is delivered with a mounting template.
A suspension clamp situated at the rear of the casing enables the
boiler to be directly suspended on the mounting bracket.
1. Position the mounting template to the wall with adhesive tape.
CAUTION
4
4
2. Drill 2 holes with a Ø of 10 mm.
Additional holes are provided in case one or other of the
standard locating holes prevents the correct location of the
plugs.
3. Insert the rawplugs with a Ø of 10 mm.
4. Attach the mounting bracket to the wall with the provided bolts with
a Ø of 10 mm.
5. Hang the boiler on the mounting bracket.
The relevant assembly instruction describes how to hang
the mounting frame (accessory).
T001540-A
Using a spirit level, check that the mounting axis is
perfectly horizontal.
During mounting, cover up the connection points for
the air supply and the combustion gas exhaust, to
protect the boiler and its connections from dust. Only
remove this protection at the time when these
connections are made.
4. Installation
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Calenta 40cCalenta 28cCalenta 35s

Table of Contents