Remeha P 500 TABLE OF CONTENT Preface Assembly guidelines and installation requirements Description of the unit General General Water connections Burners Boiler assembly Construction data Instrument panels General Equipment contents Sections Instrument panel High/Low with hours run Casing meters Wiring diagram instrument panel High/Low...
Remeha boiler, model P200 installation please do not hesitate to contact us. Read these instructions carefully before putting the boi- The data published in these technical instructions is ler into operation;...
Remeha P 500 3 TECHNICAL DATA AND DIMENSIONS 3.1 Dimensions Front view Side view Rear view Flow NG 150 - DIN2633 Return NG 150 - DIN2633 Flue ØD ext. Flanges in accordance with BS 4505 PN 16 Fig. 02 Dimensions 00.15D.79.00006...
Remeha P 500 5.1.4 Water treatment 5.2 Economisers The system should be fi lled with mains cold water (for ECO’s can be delivered upon request (for natural gas the UK this will usually have a pH of between 7 and 8).
7.1 General At the front of the boiler a fl ange is provided with 2 The Remeha boiler P 500 is delivered in individual parts. x G ½” threaded holes for the fi tting of the thermostat The sizes of the boiler parts are such that they all can pockets.
Remeha P 500 8 INSTRUMENT PANELS 8.1 Equipment contents See par. 8.2 for an instrument panel High/Low with hours The panels contain all the necessary control and measu- run meters. Several extra options can be built into the ring instruments required to control the boiler. The con- panels.
Remeha P 500 9 COMMISSIONING Note: 9.2 Pressurized boiler with oil burner Commissioning to only be carried out by a qualifi ed engineer with the relevant training and certifi cation i.e. 9.2.1 Commissioning procedure Acops-Corgi and a commissioning data sheet completed If the boiler is to be put into operation again following on site for issue to owner.
10 FAULT FINDING High Limit thermostat lock out: - Check the water circulation (circulation pump). Reset the High Limit thermostat (Reset button is on the instrument panel under the cover cap of the High Limit thermostat). - Advise the installer in the event of continued lockouts. 11 MAINTENANCE RECOMMENDATIONS 11.1 General - Vacuum clean the boiler and the combustion cham-...