Check Points Before Commissioning; Preparing The Boiler For Commissioning - REMEHA Quinta Pro 30 Installation And Service Manual

Wall-hung gas condensing boilers
Hide thumbs Also See for Quinta Pro 30:
Table of Contents

Advertisement

Quinta Pro 45 - 65 - 90 - 115
Fault:
Boiler indicates a fault. This can be seen from the t code
c
and red display.
Antifreeze protection:
]
Boiler is running in frost protection mode.
Hour counter menu:
\
Readout of the operating hours, number of successful
starts and hours on mains supply.
5.2

Check points before commissioning

080310 - 123157-AA
Burner level:
Boiler is running at full or low load.
I
Locking the keys:
d
Key lock-out is activated.
5.2.1.

Preparing the boiler for commissioning

WARNING
Do not put the boiler into operation if the supplied gas is
not in accordance with the approved gas types.
Preparatory procedure for boiler commissioning:
4 Check that the gas type supplied matches the data shown on the
boiler's rating plate.
4 Check the gas circuit.
4 Check the hydraulic circuit.
4 Check the water pressure in the heating system.
4 Check the electrical connections to the thermostat and the other
external controls.
4 Check the other connections.
4 Test the boiler at full power. Check the setting of the gas/air ratio
and, if necessary, correct it.
4 Test the boiler at low power. Check the setting of the gas/air ratio
and, if necessary, correct it.
4 Finalizing work.
5. Start-up