Quinta Pro 45 - 65 - 90 - 115
7.5
Checklist for periodic inspection and maintenance
Inspection and/or service activities,
1
Checking the hydraulic pressure (Recommendation: 1,5 to 2
bar)
2
Checking the tightness of the combusted gases evacuation and
air inlet connections
3
Checking the automatic air vent
4
Checking the safety valve
5
Checking the siphon
6
Checking the ionisation current
7
Checking the burner and heat exchanger (cv)
8
Inspection of the ionisation electrode/ignition electrode
9
Assembling the boiler (Replace all sealing that was removed)
10 Filling and refitting the syphon
11 Checking the tightness of the combusted gases evacuation and
air inlet connections
12 Checking combustion (CO
13 Number of operating hours
14 Number of successful starts (%)
15 Service message deleted or service indicator reset
16 Remeha service set A, B, C used
17 Boiler visually inspected
18 Extra maintenance work that was undertaken
19 Confirmation of inspection
Date
(signature of engineer)
080310 - 123157-AA
7.4.3.
1. Follow the procedure in reverse to re-assemble all of the
components.
2. Fill the siphon with water.
3. Put the siphon back in place.
4. Carefully open the main water valve, fill the installation, vent it and,
if need be, top it up with water.
5. Check the seals on the gas and water connections.
6. Switch the boiler back on.
T002874-B
) (Full load/Part load)
2
Assembling the boiler
CAUTION
During inspection and maintenance operations, always
replace all gaskets on the parts removed.
After a service complete the checklist ( ¼ "Checklist
for periodic inspection and maintenance", page 81.
Confirmation and date
(dd-mm-jj) (dd-mm-jj) (dd-mm-jj) (dd-mm-jj) (dd-mm-jj)
7. Checking and maintenance
81