5. Start-up
C
C
52
5.2.2.
1. Open the main gas valve.
2. Unscrew the two screws located under the front panel by a quarter
3. Tilt the control box forwards by opening the holding clips located
T002865-B
4. Check the gas supply pressure at the measurement point C on the
5. Check the tightness of the gas connections made after the gas
6. Check the leak tightness of the gas inlet, including the gas
T002866-B
7. Bleed the gas supply pipe by unscrewing the measurement point
8. Check the tightness of the gas connections in the boiler.
5.2.3.
4 Check the syphon — this must be completely filled with clean
4 Check that the hydraulic connections are leak tight.
5.2.4.
4 Check the electrical connections, particularly the earth.
4 Check the electrical connections to the thermostat and the other
5.2.5.
Gas circuit
WARNING
Ensure that the boiler is switched off.
turn and remove the panel.
at the sides.
gas valve unit.
WARNING
¼ To ascertain the gas types permitted, see chapter:
"Device categories", page 7
valve unit in the boiler.
valves. The test pressure must not exceed 60 mbar.
on the gas block. Tighten the measurement point when the pipe
has been sufficiently bled.
Hydraulic circuit
water.
Electrical connections
external controls.
Checklist for commissioning
Quinta Pro 45 - 65 - 90 - 115
080310 - 123157-AA