1. Open the main gas valve.
2. Unscrew the two screws located under the front panel by a quarter
3. Tilt the control box forwards by opening the holding clips located
T002865-B
4. Check the gas supply pressure at the measurement point C on the
5. Check the tightness of the gas connections made after the gas
6. Check the leak tightness of the gas inlet, including the gas
T002866-B
7. Bleed the gas supply pipe by unscrewing the measurement point
8. Check the tightness of the gas connections in the boiler.
5.2.3.
4 Check the syphon — this must be completely filled with clean
4 Check that the hydraulic connections are leak tight.
5.2.4.
4 Check the electrical connections, particularly the earth.
4 Check the electrical connections to the thermostat and the other
5.2.5.

Gas circuit

WARNING
Ensure that the boiler is switched off.
turn and remove the panel.
at the sides.
gas valve unit.
WARNING
¼ To ascertain the gas types permitted, see chapter:
"Device categories", page 7
valve unit in the boiler.
valves. The test pressure must not exceed 60 mbar.
on the gas block. Tighten the measurement point when the pipe
has been sufficiently bled.

Hydraulic circuit

water.

Electrical connections

external controls.

Checklist for commissioning

Quinta Pro 45 - 65 - 90 - 115
080310 - 123157-AA

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Quinta pro 90Quinta pro 115Quinta pro 45Quinta pro 65

Table of Contents