Installation; General; Preparation; Positioning The Boiler - REMEHA Quinta Ace Installation, User And Service Manual

Table of Contents

Advertisement

6 Installation

6
Installation
6.1

General

6.2

Preparation

Fig.10
Mounting the boiler
1
1
2
3
4
2
5
6.3

Hydraulic connections

24
(1 5
2 )
1 0
0
Ø
1 5
0
5 0
3 0
5
5 0
Ø
10
(2 x)
3 0
0
Ø
1 4
1 5
3
0
5 0
5 0
Ø
10
1 0
(2 x)
0
59
0
23
3. 1
22
3
D E
TA
IL
S C
A LE
: 1:
2
1 7
59
5
7
3 0
0
21
8. 1
83
.6
1 8
5
6 0
6 0
0
1 3
0
1 1
0
7610
364-
01
761
036
4
AD-0000107-01
Warning
The boiler must be installed by a qualified installer in accordance
with local and national regulations.
6.2.1

Positioning the boiler

The fitting bracket on the back of the casing can be used to mount the
boiler directly on the suspension bracket.
The boiler is supplied with a mounting template.
1. Attach the mounting template of the boiler to the wall using adhesive
tape.
Warning
Use a level to check whether the mounting template is hanging
perfectly horizontally.
Protect the boiler against building dust and cover the flue gas
outlet and air supply connection points. Only remove this cover
to assemble the relevant connections.
2. Drill 4 holes of Ø 10 mm.
3. Fit the Ø 10 mm plugs.
4. Attach the suspension bracket to the wall with the Ø 10 mm bolts
supplied.
5. Mount the boiler on the suspension bracket at the level of the arrows
on the side of the boiler.
Warning
The weight of the boiler exceeds the maximum lift weight for
one person. Observe the applicable regulations. We recom­
mend the use of a lifting aid. Please ensure all necessary care
is taken when lifting the boiler on to the wall mounting bracket.
The plugs supplied are only suitable for concrete. Select the
correct plugs for installation on other materials.
6.3.1

Rinsing the system

The installation must be cleaned and flushed in accordance with BS 7593
(2006) and BSRIA BG 33/2014.
Before a new CH boiler can be connected to an existing or new installa­
tion, the entire installation must be thoroughly cleaned and flushed. This
step is absolutely crucial. The flushing helps to remove residue from the
installation process (weld slag, fixing products etc.) and accumulations of
dirt (silt, mud etc.)
Important
Flush the CH installation with a volume of water equivalent to at
least three times the volume of the CH installation. Flush the DHW
pipes with at least 20 times the volume of the pipes.
7625116 - v.04 - 17012017