Installation; Positioning The Boiler; Hydraulic Connections; Connecting The Heating Circuit - REMEHA Quinta Ace 30 Installation And User Manual

High-efficiency wall-hung gas boiler
Hide thumbs Also See for Quinta Ace 30:
Table of Contents

Advertisement

5 Installation

5
Installation
5.1

Positioning the boiler

Fig.11
Mounting the boiler
1
2
3
4
5
5.2

Hydraulic connections

5.2.1

Connecting the heating circuit

Fig.12
Connecting the CH flow and CH
return
3
4
5
4
22
The fitting bracket on the back of the casing can be used to mount the
boiler directly on the suspension bracket.
The boiler is supplied with a mounting template.
1. Attach the mounting template of the boiler to the wall using adhesive
tape.
Warning
2. Drill 2 holes of Ø 10 mm.
Important
The extra fixing holes in the suspension bracket are intended for
use in the event that one of the two holes is not suitable for the
correct fastening of the plug.
3. Fit the Ø 10 mm plugs.
4. Remove the mounting template.
5. Attach the suspension bracket to the wall with the Ø 10 mm bolts
supplied.
6. Mount the boiler on the suspension bracket.
AD-0000018-02
1. Remove the dust cap from the CH flow connection
of the boiler.
2. Fit the outlet pipe for CH water to the CH flow connection.
3. Remove the dust cap from the CH return connection
1
bottom of the boiler.
4. Fit the inlet pipe for CH water to the CH return connection.
5. Install the pump in the CH return pipe (if applicable).
2
See also
Connecting the standard pump, page 31
Connecting the PWM pump, page 31
AD-4100110-01
Use a level to check whether the mounting template is hanging
perfectly horizontally.
Protect the boiler against building dust and cover the connection
points for the flue gas outlet and air supply. Only remove this
cover to assemble the relevant connections.
at the bottom
at the
7684359 - v.11 - 13122021

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents