Putting The Appliance Into Operation - REMEHA Quinta Pro 30 Installation And Service Manual

Wall-hung gas condensing boilers
Hide thumbs Also See for Quinta Pro 30:
Table of Contents

Advertisement

Quinta Pro 45 - 65 - 90 - 115
No. Work to be undertaken for commissioning
1
Filling the central heating system with water and checking the water pressure
2
Fill the siphon with water
3
Vent the air in the heating system
4
Checking the water-side connections for tightness
5
Checking the type of feed gas
Checking that the boiler is suitable for the feed gas?
6
Checking the gas supply pressure
7
Checking the capacity of the gas meter
8
Checking the tightness of the connections and the gas pipes
9
Vent the gas supply pipe
10
Checking the electrical connections
11
Checking the air supply connections and flue gas discharge connections
12
Checking the functioning and operational status of the boiler
13
Checking the air/gas ratio
14
Remove the measuring device and close the measurement points
15
Correctly fit the front housing of the boiler
16
Attaching the "Gas Type" sticker
17
Set the room thermostat or the regulator
18
Instruct the user and hand over the necessary documents
19
Fill in the guarantee card together with the user
20
Confirmation of commissioning
(Company name, signature of engineer)
5.3

Putting the appliance into operation

080310 - 123157-AA
1. Tilt the control box upwards again and fasten it using the clips
located at the sides.
2. Open the main gas valve.
3. Open the gas valve on the boiler.
4. Throw the main switch.
5. Power up by throwing the on/off switch on the boiler.
6. Set the components (thermostats, control system) so that they
request heat.
7. The start-up cycle begins and cannot be interrupted. During the
start-up cycle, the display shows the following information:
A short test where all segments of the display are visible.
fK[xx : Software version
pK[xx : Parameter version
The version numbers are displayed alternately.
8. A bleed cycle of a duration of around 3 minutes is carried out
automatically.
If a DHW sensor is connected and the anti-legionella
function is activated, the boiler starts to heat the water in
the DHW tank as soon as the vent programme has been
completed.
By pressing the ® key for a short time, the current operating status
is shown on the display:
Attachment / Measured values
Date:
5. Start-up
53

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Quinta pro 90Quinta pro 115Quinta pro 45Quinta pro 65

Table of Contents