5 Installation
Tab.39
Electrical connections to be bridged on CB-01
Producer
Connection
B
CB-01
(1)
BL
(1) Bridge: These connectors must be bridged. Some bridges are already factory-fitted, some need to be fitted for this specific installation
example.
Tab.40
Parameters to be set
Producer
Connection
CU-GH13
(1)
AP102 = 0
CP020 = 0
DP007 = 0
(1) Parameters to be set: The parameters are separated per PCB, and must be set on that specific PCB.
Tab.41
Parameter list
Code
Display text
AP102
Boiler Pump function
CP020
Zone Function
DP007
Dhw 3wv Standby
CP021
Zone Function
CP020
Zone Function
5
Installation
5.1
Positioning the boiler
30
CH 1 / CircB 1
DHW 1
CH 1 / CircB 1
DHW 1
SCB-02
SCB-02
CP021 = 1
CP020 = 6
Menu path
> Installation Setup > CU-GH13 > Gas fired appliance >
Parameters, counters, signals > Parameters > General
> Installation Setup > CU-GH13 > CIRCA > Parameters,
counters, signals > Parameters > General
> Installation Setup > CU-GH13 > Internal DHW > Parameters,
counters, signals > Parameters > General
> Installation Setup > SCB-02 > CH 1 > Parameters, counters,
signals > Parameters > General
> Installation Setup > SCB-02 > DHW 1 > Parameters,
counters, signals > Parameters > General
Refer to the lifting instructions document on how to unpack and transport
the boiler to the location.
Set to
0 = No
0 = Disable
0 = CH position
1 = Direct
6 = DHW tank
7734324 - v.07 - 21092022