Factory Test - REMEHA Quinta Pro 30 Installation And Service Manual

Wall-hung gas condensing boilers
Hide thumbs Also See for Quinta Pro 30:
Table of Contents

Advertisement

1. Introduction
Quinta Pro 45 - 65 - 90 - 115
For all provisions and Directives referred to in these instructions, it is
agreed that all addenda or subsequent provisions will apply at the
time of installation.
1.4.4.

Factory test

Before leaving the factory, each boiler is set for optimum performance
and tested to check the following items:
4 Electrical safety
4 Adjustment (CO
)
2
4 Water tightness
4 Gas tightness
4 Parameter settings
8
080310 - 123157-AA