Settings On The Ae-200 For Billing Function; Settings On The Ae-200 - Mitsubishi Electric AE-200A Instruction Book

Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

6-2. Settings on the AE-200 for billing function

Preparation
Normal initial settings
Initial settings
Billing
function
Checking the initial settings (before billing function trial run)
trial run
1st run check (after air conditioning unit
continuous operation)
2nd run check (at least 10 days after 1st
run)
3rd run check (at least 1 month after 2nd
run)
*5
*1 Complete settings such as unit settings, network settings, license registration, group settings, block settings and measurement settings.
*2 Refer to section 6-1-2 "Required settings to use an apportioned electricity billing function" for items to be set on the Initial Setting Tool
and Charge Calculation Tool.
*3 If any setting changes are needed during a billing function trial run, make the settings on the Initial Setting Tool.
*4 Run each indoor unit continuously for at least 2 hours.
*5 Check at least 1 month after the 2nd billing function trial run on the day after the closing date.

6-2-1. Settings on the AE-200

Setting item
License registration
Basic
settings
Unit information
*1 Settable items vary.
WT07442X02
*1
and trial run for all AE-200 systems
AE-200 settings
Settings on the Initial Setting Tool
Settings on the Charge Calculation Tool
Air conditioning unit continuous
operation
*4
Trial run period (at least 1 day)
Charge calculation (Specified date
calculation)
Air conditioning unit normal operation
Trial run period (at least 10 days)
Charge calculation (Specified date
calculation)
Air conditioning unit normal operation
Trial run period (at least 1 month)
Charge calculation (Specified date
calculation)
Initial
Setting
Tool
*2
*2
*3
*3
*3
◎ : Items required to be set to use an apportioned electricity billing function
○ : Items that can be set
Charge
Reference
Calculation
page
Tool
*1
56
55
<Billing function trial run example>
to Apr. 1
Billing function trial
Apr. 2
run period
1st run check
Apr. 3
(Specified date calculation (Apr. 2))
Billing function trial
Apr. 4 to 13
run period
2nd run check
Apr. 14
(Specified date calculation (Apr. 4 to 13))
Billing function trial
Apr. 15 to May 20
run period
3rd run check
May. 21
(Specified date calculation (Apr. 15 to May 20))
AE-200/AE-50's
Web Browser for
LCD
Initial Settings
*1
*1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-50aEw-50aae-200eEw-50eAe-50e

Table of Contents