3rd run: Checking for the day after the closing date (at least 1 month after 2nd run)
• From [Option] > [Output - Check sheet for billing function trial run] on the Initial Setting Tool, output the "Items
to be checked on the next day of the closing date" check sheet.
• Enter the AE-200 measurement value and the electric power on the electricity meter before the trial run on
the check sheet.
• Check the difference in electric energy between *3 (before trial run) and *4 (after trial run). (Refer to section
7-3-1 [1] (2) "Checking the difference".)
• Carry out the checks in *5. (The period is from the 2nd trial run to the closing date.)
Final checks
• Check again that there are no errors in the settings for actual operation. (Refer to section 7-4-1 "Final checks
for the operation settings".)
• Check that the required fields on all check sheets are entered without any mistake and that there are no
mistakes in the measurement results.
• Then present the information to the customer and store it safely.
Note
• This description is for systems where electric energy is metered (with-metering-device method). For
systems where the electric energy is entered manually (no-metering-device method), no metering device-
related checks are required.
• Three types of billing function trial run check sheets can be output: "Items to be checked after the trial run",
"Items to be checked 10 days after the trial run" and "Items to be checked on the next day of the closing
date". However, if any setting changes are needed during a trial run, make the settings on the Initial
Setting Tool and then carry out the billing function trial run checks again.
• If you change any billing function settings, such as changing the energy management block during
operation, carry out the billing function trial run checks again.
[1] Adjusting AE-200 measurement values
Match the measurement values on the Measurement screen on the AE-200's LCD to the electricity meter
value used in the apportioned electricity billing function.
Procedures
1. Go to [Initial Settings] > [Unit Info. 2] and set "Test run" to [Use]. Then touch [Save Settings].
2. Touch [Monitor/Operation] > [Measurement] to display the Measurement screen.
3. Touch "Controller" and select the centralized controller with the electricity meter connected.
4. Touch the "Measurement value edit" icon (
edit screen.
5. Touch "Edit the adjusted measurement value" and enter the current electricity meter value. Then touch [OK].
6. After completing the editing, return to [Initial Settings] > [Unit Info. 2] screen and set "Test run" back to [Do
not use]. Then touch [Save Settings].
* Because the display does not change even if a pulse is input while the Measurement value edit screen is displayed, it is
recommended that the values be edited while the air conditioning unit is stopped.
* Editing the electric energy only changes the display in this screen. It does not affect the charge outcomes, etc.
Measurement screen
WT07442X02
*4
(Refer to section 7-3-1 [1] (1) "Entering the electric energy (after trial run)".)
) beside the electric energy to open the Measurement value
Measurement
value edit
Edit the adjusted
measurement value
101
Measurement value edit screen

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-50aEw-50aae-200eEw-50eAe-50e

Table of Contents