Entering The Electric Energy - Mitsubishi Electric AE-200A Instruction Book

Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

[2] Indoor unit settings (group, block, energy management block)
Check that there are no errors in the settings.
⑪ Group
Check that there are no errors in the group names or in the correlations between the indoor unit addresses
and group numbers set in section 6-6-1 "Group settings".
⑫ Operation block
Check that there are no errors in the block names or in the correlations between the group numbers and
block numbers set in section 6-6-4 "Block settings".
⑬ Energy management block
Check that there are no errors in the energy management block names or in the correlations between the
block numbers and energy management block numbers set in section 6-6-5 "Energy management block
settings".

7-2-3. Entering the electric energy

Enter the electric power value of the electricity meter and the AE-200 measurement values in the billing-related
item sheet.
Current reading of the metering device
① Enter the confirmed date and time.
② Enter the meter display before the trial run (5-digit number).
③ Enter the measurement value before the trial run (meter display value × linear weight).
Current reading of the centralized controller
④ Enter the confirmed date and time.
⑤ Enter the monitored value before trial run from [Monitor/Operation] > [Measurement] on the AE-200's LCD.
Note
• To display the measurement data on
the AE-200's LCD, touch [Monitor/
Operation] > [Measurement].
WT07442X02
Controller
Select [AE200] to
display the data for
AE-200, and select
between [Exp1] though
[Exp4] to display
the data for each
AE-50/EW-50.
Measurement item
Measurement value
107
Measurement screen on the AE-200's LCD

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-50aEw-50aae-200eEw-50eAe-50e

Table of Contents