Billing Function Trial Run Checks - Mitsubishi Electric AE-200A Instruction Book

Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

7-3. Billing function trial run checks

If any of the numbers deviated during billing function trial run checks, modify the settings and then carry out
another billing function trial run.
7-3-1. 1st run check (after air conditioning unit continuous operation)
Once the billing function settings are complete (before continuous operation), check after the air conditioning
units have been run for at least 2 hours.
Use the check sheet printed out in the previous section.
[1] Billing-related item sheet
(1) Entering the electric energy (after trial run)
Enter the electricity meter value and AE-200 measurement value after the trial run.
Current reading of the metering device
① Enter the confirmed date and time.
② Enter the meter display after the trial run.
③ Enter the measurement value after the trial run.
Current reading of the centralized controller
④ Enter the confirmed date and time.
⑤ Enter the monitored value after the trial run.
Note
• Refer to section 7-2-3 "Entering the electric energy" for details.
WT07442X02
(5)
(1)
(2)
108
(1)
(2)
(4)
(3)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-50aEw-50aae-200eEw-50eAe-50e

Table of Contents