Mitsubishi Electric AE-200A Instruction Book page 111

Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

(5) Checks
Carry out final checks, and if there are no incorrect settings, put a check in the check column.
[2] Unit-related item sheet
Output the "Energy management block" CSV data (apportioned results) from the AE-200 and enter the
values.
Extracting the CSV data
Procedures
1. Remove the AE-200 cover and connect a USB memory to the AE-200.
2. Go to [Energy Mgmt] > [Energy management list] screen and select [CSV output].
3. Set the period when the billing function trial run was carried out, and with [Energy management block] and
[1-day intervals] selected, touch [CSV output].
The electric energy for each unit price in the specified time period will be displayed. Enter the information on
the check sheet.
WT07442X02
111

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-50aEw-50aae-200eEw-50eAe-50e

Table of Contents