Control During Operation
7.3

Circuit Breaker Test Function

7-42
The circuit breaker and the trip circuits can be tested during normal operation by exe-
cution of a TRIP and CLOSE command via the device.
A prerequisite for this test is that the required test commands were allocated to the cor-
responding command relays during the configuration of the device. It is also possible
to test the individual circuit breaker poles, provided that the device is capable of single-
pole tripping, the circuit breaker is capable of single-pole tripping and that the wiring
and routing has been done accordingly.
A maximum of 4 test programs is available (refer to Table 7-5). For the circuit breaker
it may be possible to initiate single- and three-pole TRIP/CLOSE cycles. In the event
of three-pole tripping, only item 4 is important.
Table 7-5
Circuit breaker test programs
Item
Test Program
1
1-pole TRIP/CLOSE–cycle phase L1
2
1-pole TRIP/CLOSE–cycle phase L2
3
1-pole TRIP/CLOSE–cycle phase L3
4
3-pole TRIP/CLOSE–cycle
associated close command
In the event that circuit breaker auxiliary contacts are used to derive the switching
state of the circuit breaker via binary inputs to the device, the test cycle can only be
initiated when the circuit breaker is in closed position.
Note:
For CB Test and automatic re-closure the CB auxiliary contact status derived with the
binary inputs > CB1 ... (FNo. 366 - 371, 410 and 411) is relevant for indicating the CB
switching status. The other binary inputs > CB ... (FNo. 351 - 353, 379 and 380) apply
to the recognition of line status (address 1134) and reset of trip command
(address 1135) which is used by the other protection functions, e.g. echo function,
switch-onto-fault overcurrent etc. . For applications with only one CB, both binary input
functions e.g. 366 and 351 can be allocated to the same physical input.
A further prerequisite for the initiation of the test is that no protection function in the
device has picked up, and that the circuit breaker is ready.
The device indicates the status of the test sequence with corresponding messages in
the display or on the monitor of a PC. If the device refuses to run or terminates the test
sequence, it is likely that one of the preconditions for the execution of the test cycle
has not been satisfied. The reason for the refusal or termination is also shown in the
front display or monitor of the PC.
Operational Messages
CB1–TEST TRIP command – Only L1
CB1–TEST TRIP command – Only L2
CB1–TEST TRIP command – Only L3
CB1–TEST TRIP command L123
CB1–TEST CLOSE command
C53000-G1176-C156-2
7SA6 Manual