9 COMMISSIONING

9 COMMISSIONING 9.1VISUAL INSPECTION
Verify that the relay has not suffered any damage during transportation, and that all screws are correctly fixed, and all relay
terminal boards are in good condition.
Verify that the information shown on the relay front plate corresponds to the data shown on the display, and to the
requested relay model.
Display information:
G650 X.XX(K.KK)
GENERAL ELECTRIC
G650XXXXXXXXX
19200N81 MODBUS:254
GEK-113285A
G650 Generator Protection & Control System

9.1 VISUAL INSPECTION

Firmware version
Kernel version
Model
9
9-1