GE Multilin G650 Manual page 398

Generator protection & control system
Hide thumbs Also See for Multilin G650:
Table of Contents

Advertisement

APPENDIX A
Configurable Logic Outputs (512 elements)
Operation Bits (24 elements)
GEK-113285A
VIRTUAL OUTPUT 000
VIRTUAL OUTPUT 001
...
VIRTUAL OUTPUT 511
OPERATION BIT 1
OPERATION BIT 2
...
OPERATION BIT 24
G650 Generator Protection & Control System
A.1 LOGIC OPERANDS
Configurable logic output 000
Configurable logic output 001
...
Configurable logic output 511
Operation bit 001: (0) the configured time expires or
when success conditions are met;(1) operation 1 is
executed and interlocks are fulfilled.
Operation bit 002: (0) the configured time expires or
when success conditions are met;(1) operation 2 is
executed and interlocks are fulfilled.
...
Operation bit 024: (0) the configured time expires or
when success conditions are met;(1) operation 24 is
executed and interlocks are fulfilled.
A
A-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents