Dodge 2001 Ram 1500 Owner's Manual page 2148

Table of Contents

Advertisement

BR/BE
AUTOMATIC TRANSMISSION - 46RE (Continued)
(4) Install thrust washer in low-reverse drum spot-
face (Fig. 48). Use petroleum jelly to hold washer in
place.
(5) Install snap-ring that secures low-reverse drum
to piston retainer hub (Fig. 48).
(6) Insert band reaction pin part way into case and
band link (Fig. 49).
(7) Install rear band adjusting lever, reaction lever,
and strut (Fig. 50). Be sure levers and strut are
aligned and engaged before seating band reaction pin
in case.
Fig. 48 Low-Reverse Drum Snap-Ring
1 - LOW-REVERSE DRUM
2 - TABBED WASHER
3 - SNAP-RING
Fig. 49 Rear Band Reaction Pin
1 - REACTION PIN
2 - BAND LINK
3 - REAR BAND
4 - O-RINGS
AUTOMATIC TRANSMISSION - 46RE
Fig. 50 Rear Band Levers And Strut
1 - ADJUSTING SCREW AND NUT
2 - ADJUSTING LEVER
3 - REACTION LEVER
4 - STRUT
PLANETARY GEARTRAIN, FRONT/REAR CLUTCH,
AND FRONT BAND
(1) Remove Alignment Shaft 6227-2, if installed
previously.
(2) Install assembled intermediate shaft and plane-
tary geartrain (Fig. 51). Support shaft carefully dur-
ing installation. Do not allow shaft bearing/
bushing surfaces to become nicked or scratched.
Fig. 51 Intermediate Shaft And Planetary Geartrain
1 - INTERMEDIATE SHAFT AND PLANETARY GEAR TRAIN
ASSEMBLY
21 - 513

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents