Section 4 - Samlexpower Evolution EVO-2212 Owner's Manual

Inverter/charger pure sine wave
Hide thumbs Also See for Evolution EVO-2212:
Table of Contents

Advertisement

SECTIOn 3 |
A
B
To Remote Start/Stop
C
Terminals on the
Generator
14
Optional
+
Generator Auto
-
Start/Stop Control
Module
Optional
Remote Control
EVO-RC
Ground
Terminal (5)
EVO INVERTER
CHARGER
-
Battery
External
Charge
Controller
-
PV
Solar Panel(s)
DC SIDE OF EVO
Battery Positive
1.
2.
Battery Negative
3.
External Charger Positive
4.
External Charger Negative
5.
Grounding Terminal
RF-45 Jack for Temperature Sensor
6.
7.
RJ-45 Jack for Optional Remote Control EVO-RC
14.
Status Relay Terminals for initiating automatic generator start/stop
Solar Panel(s)
!
cAution!
The Neutral Terminals of Grid and Generator Inputs are internally bonded to the metal chassis of EVO (The
Neutral Output Terminal of EVO is bonded to the metal chassis of EVO or kept isolated from the metal chassis
of EVO through Neutral to Chassis Ground bond Switching Relay; See Section 4.5.1). Hence, use PLAIN BREAKER
and NOT GFCI / GFCI protected breaker on the circuit feeding AC power from Grid / Generator to the EVO. If
GFCI / GFCI protected breaker is used on the Grid / Generator circuit feeding the EVO, the GFCI will trip due to
splitting of Neutral Return Currents.
Installation
NO - Normally Open Contact
Common
NC - Normally Closed Contact
BATTERY
A
TEMPERATURE
SENSOR MODEL
B
EVO-BCTS
C
Fuse
4
3
14
1
6
7
2
5
FRONT
(See Fig 2.1)
AC SIDE
(See Fig 2.3)
Minimum Wire
+
Battery
Size AWG #6
+
PV
Status Relay
To optional
NO
Generator Auto
Common
Start/Stop
NC
Module
fig 3.13 typical Shore based installation
BATTERY SIDE FUSE (Within 7" of Positive Post)
-
+
LEAD ACID
BATTERY BANK
12
10
8
6
4
9
5
11
7
G
GENERATOR
PANEL
L
N
NG
E
GE
Ground Rod embedded in earth.
AC SIDE OF EVO
4.
GRID LINE
5.
GRID GND
6.
GRID NEUTRAL
7.
GEN LINE
8.
GEN GND
9.
GEN NEUTRAL
10.
OUTPUT LINE
11.
OUTPUT GND
12.
OUTPUT NEUTRAL
Pos (+)
Bus
G-B
LINE
N
To
Loads
N-B
G-B
GRID ELECTRICAL
PANEL (120/240VAC),
SPLIT PANEL
N-B
A
B
G-B
NG
OTHER
Circuit breaker
A
120 VAC Leg A
B
120 VAC Leg B
(Legs A&B are split phases)
N-B
Neutral Bus Bar
NG
Neutral to Ground Bond
G-B
Grounding Bus Bar
GE
Grounding Electrode (Ground Rod)
E
Earth Connector on generator
(bonded to frame/chassis of the generator)
N
Neutral terminal of generator output
L
Line terminal of generator output
G
Grounding terminal of generator output
SAMLEX AMErICA INC. | 57
DC ELECTRICAL
PANEL
Neg (-) Bus
ELECTRICAL
SUB- PANEL
FOR EVO
(
CAUTION!
Use 120 VAC
Single Phase
Panel and NOT
120/240VA
Split Phase
Panel)
SERVICE
PANEL
+
-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents