Toyota 1KZ-TE Repair Manual page 236

Fo toyota hilux kzn165 series
Hide thumbs Also See for 1KZ-TE:
Table of Contents

Advertisement

CLICK HERE TO VIEW CHAPTER INDEX
FU- -14
ENGINE FUEL
- -
INJECTION NOZZLE
4 .
I NS TALL I NTAKE P I P E
(a)
Install the PCV pipe with the 2 nuts to the intake pipe.
(b)
Install the accelerator cable bracket with the 2 nuts to the
intake pipe.
Torque: 20 N∙m (200 kgf∙cm, 15 ft∙lbf)
(c)
Place a new gasket on the intake manifold.
(d)
Connect the air hose and install the intake pipe.
(e)
Press the clamp lock together with the pliers and press
down the tip of the lock plate. Carefully let the lock spread
P11558
apart.
Take care not to let the pliers slip.
(f)
Connect the 2 PCV hoses.
(g)
Install the 4 seal washers and nuts.
Torque: 12 N∙m (120 kgf∙cm, 9 ft∙lbf)
(h)
Connect the vacuum hose to the 3--way (to vacuum
pump).
(i)
Connect the 2 vacuum hoses to the actuator.
(j)
Connect the 2 VSV connectors.
5 .
S TART E NG I NE AND CHE CK FO R F UE L L E AKAG E
S04839
1KZ-TE
Pages From Manual
TO MODEL INDEX

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents