Detaching And Refitting The Heat Roller - Olivetti d-Copia 5200MF Service Manual

Hide thumbs Also See for d-Copia 5200MF:
Table of Contents

Advertisement

2KR/2KS

(5) Detaching and refitting the heat roller

Follow the procedure below to replace the heat roller.
Procedure
1. Remove the fuser unit (see page 1-5-30).
2. Remove the upper fuser cover (see page 1-
5-31).
3. Remove the press roller and fuser heater
(see page 1-5-32 and 1-5-33).
4. Remove the fuser gear.
5. Remove the heat roller from the fuser unit.
Remove the C ring, gear, bearing and bush-
ing on the rear side of the heat roller and
remove the C ring, ground plate, bearing
and bushing on the front side.
6. Replace the heat roller and install the roller
to the fuser unit.
7. Refit the fuser gear.
8. Refit the fuser heater, press roller and upper
fuser cover.
9. Refit the fuser unit.
1-5-34
Bearing
Ground plate
Bushing
C ring
Service Manual
Fuser gear
Figure 1-5-68
Bushing
Bearing
Heat roller
Figure 1-5-69
C ring
Gear
Y111960-2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D-copia 4200mf

Table of Contents