2KR/2KS
(5) Detaching and refitting the heat roller
Follow the procedure below to replace the heat roller.
Procedure
1. Remove the fuser unit (see page 1-5-30).
2. Remove the upper fuser cover (see page 1-
5-31).
3. Remove the press roller and fuser heater
(see page 1-5-32 and 1-5-33).
4. Remove the fuser gear.
5. Remove the heat roller from the fuser unit.
Remove the C ring, gear, bearing and bush-
ing on the rear side of the heat roller and
remove the C ring, ground plate, bearing
and bushing on the front side.
6. Replace the heat roller and install the roller
to the fuser unit.
7. Refit the fuser gear.
8. Refit the fuser heater, press roller and upper
fuser cover.
9. Refit the fuser unit.
1-5-34
Bearing
Ground plate
Bushing
C ring
Service Manual
Fuser gear
Figure 1-5-68
Bushing
Bearing
Heat roller
Figure 1-5-69
C ring
Gear
Y111960-2