Mitel Inter-Tel 5000 Installation And Maintenance Manual page 208

Hide thumbs Also See for Inter-Tel 5000:
Table of Contents

Advertisement

Chapter 5: Installation
Analog Fallback System [Europe Only]
Figure 5-50.
Fallback operation can be tested by removing the line cord from the CPU. This will force all
fallback circuits to operate and may disconnect any calls on these circuits.
Page 5-86
Fallback Connections
Dedicated Connections
To PSTN
To LSM-2/4
PSTN
COU
System Connections
To PSTN
To LSM-2/4
PSTN
COU
PSTN
COU
To
To SL Ports
Endpoint
in chassis
To Dedicated
Fallback Endpoint
J20
Connectors
F/B
J20
Connectors
F/B
J20
Connectors
F/B
®
Inter-Tel
5000 Installation Manual – Issue 2.4, May 2008

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents