Extreme Networks Summit X150 Series Hardware Installation Manual page 313

Summit family
Hide thumbs Also See for Summit X150 Series:
Table of Contents

Advertisement

Figure 292: EPS-C2 2x9 Pin Redundant Power Cable with Connector Key Tab
Five 2X7-pin connectors
These connectors are compatible with the Summit X440 series switches.
Figure 293: EPS-C2 2x7 Pin Redundant Power Cable with Connector Key Tab
The redundant power cable has keyed ends. The key is a plastic tab on the cable connector housing to
ensure correct alignment of the connector. The keyed ends of the 2x7 cable are not symmetrical; one
end of the cable will fit into the EPS-C2 chassis and the other end will fit into the summit x440 switch.
A switch on the front of the EPS-C2 chassis (see the figure below) selects which connector type is
active for the power system.
Figure 294: EPS-C2 Connector Selector Switch
After the EPS-C2 has been installed in a rack and the power supplies have been installed, do the
following to connect the redundant power cables:
1
Set the connector selection switch for either the 2X9 or 2X7 connectors.
2 Connect the keyed end (for the 2x7 connector cable, the end with the tab offset from the edge of
the connector pins) of the redundant power cord to the EPS-C2 chassis (see
the Redundant Power Cord
3 Verify that the side of the connector marked TOP is facing up.
Summit Family Hardware Installation Guide
on page 314).
Installing Summit External Power Supplies
Figure 295: Installing
313