Operation Items For Test Run - Omron MX2 Series User Manual

Mx2 series type v1 multi-function compact inverter
Hide thumbs Also See for MX2 Series:
Table of Contents

Advertisement

3 Operation and Test Run
3-4

Operation Items for Test Run

The following describes the operation items for test run.
Installation
Check that the inverter meets the installation conditions.
For details on installing the inverter, refer to 2-1 Installation on page 2-4.
Wiring and Connections
Select peripheral equipment according to the specifications and wire the cables securely.
For details on wiring the inverter
Power-on
Points to be checked before turning ON the power
Check that the power supply voltage is appropriate and that the power supply input terminals (R/L1,
S/L2, T/L3) are securely wired.
The rated input voltage of the 3G3MX2-V1 Series Inverter is as follows.
3G3MX2-A2 -V1
3G3MX2-A4 -V1
3G3MX2-AB -V1
Check that the motor is securely connected to the motor output terminals (U/T1, V/T2, W/T3).
Check that the controller is securely connected to the control circuit terminals. In addition, turn off
the control terminals.
Set the motor in a no-load state (not connected to the mechanical system).
Power-on
If no problem is found in above checks, turn on the power supply.
3 - 22
2-3 Wiring on page 2-10.
, refer to
Model
3-phase 200 to 240 VAC
3-phase 380 to 480 VAC
Single-phase 200 to 240 VAC
Power supply voltage
Multi-function Compact Inverter 3G3MX2-V1 User's Manual (I585-E1)