HP T9576G06 Management Manual page 684

Snmp configuration and management manual
Table of Contents

Advertisement

Ethernet Subagent
ZEMS-VAL-NULL
indicates the type of subsystem defined event. Because the Ethernet Subagent
process has not defined this as a private event, the DDL AS clause "undefined"
always appears in the message text following "user content."
Cause. The backup Ethernet Subagent process stopped or failed to start.
Effect. The Ethernet Subagent process continues to run without a backup.
Configuration changes are not saved if a primary process failure occurs.
Recovery. Check the status of the configured backup processor (zesaBackupCPU). If
it is not available or there are insufficient resources to run a backup process, disable
the backup (set zesaBackupState "Disabled (3)"), set the zesaBackupCPU to an
available processor, and reenable the backup (set zesaBackupState "Enabled(4)").
Sample Message
98-07-08 30:54:34 \NOVA.$ZESA
98-07-08 11:12:19 \NOVA.$ZESA
SNMP Configuration and Management Manual—424777-006
3006: ZESA-EVT-BACKUP-OBJ-UNAVAIL
TANDEM.ETHSA.G06
Object unavailable
\NOVA.$ZESA:384566222,
event number: backup-process-unavailable,
cause: underlying-serv-failed,
previous state: connected,
current state: disconnected,
underlying object: \NOVA.$ZESA:384566222,
symptom string: T0326G06_25JUN98_ETHSA,
user content: undefined
TANDEM.ETHSA.G06
Object unavailable
\NOVA.$ZESA:384566222,
event number: backup-process-unavailable,
cause: operator-initiated,
previous state: connected,
current state: disconnected,
user content: undefined
14-48
003006
backup-process -
003006
backup-process -

Advertisement

Table of Contents
loading

This manual is also suitable for:

T9576h01

Table of Contents