Executing an Echoback Test between Nodes

1. While online, open the Online Connection Information Window, right-click the target
The PLC Internode Echoback Test Dialog Box will be displayed.
2. Input (or confirm) the target item, and click the Connect Button.
The connection results will be displayed.
10-2-4
Field
Item
Test Results
Success
Failure
Response time
Max (ms)
Min (ms)
Average (ms)
PLC or Unit, and select Echoback test between PLC nodes from the pop-up
menu.
10-2
Echoback Test between Nodes
Executing an Echoback Test between Nodes
Contents
Displays the number of test successes. If set for "Frequency
is not specified," a "-" is displayed.
Displays the number of test failures. The test is ended when
1,000 failures is reached.
Displays the maximum response time.
Displays the minimum response time.
Displays the average response time. If set for "Frequency is
not specified," the display shows the average for the last ten
times.
10-23