Emc-Compliant Installation; Emc Zones In The Control Cabinet; Shielding And Potential Equalization Inside The Control Cabinet - Siemens SINAMICS G220 Operating Instructions Manual

Table of Contents

Advertisement

4.14

EMC-compliant installation

4.14.1

EMC zones in the control cabinet

Description
Spatially separating disturbance sources and disturbance sinks avoids mutual disturbances. To
achieve this, the control cabinet and the plant or machine are split up into EMC zones.
Disturbance sources and disturbance sinks are installed in their own specific EMC zones.
An EMC-compliant control cabinet is structured as follows:
• All devices in the control cabinet are assigned to the appropriate EMC zones.
• Using one of the following measures, the zones are electromagnetically decoupled from one
another:
– Lateral clearance
– Separate metal enclosure
– Partition panels with large surface areas
• The cables associated with various EMC zones are routed in separate cable harnesses or cable
ducts.
• Filters or isolating amplifiers are used at the interfaces of the EMC zones.
4.14.2

Shielding and potential equalization inside the control cabinet

Description
A control cabinet with EMC-compliant shielding is structured as follows:
• The size of the openings and breakouts at the control cabinet depend on whether it is to be
used in the 1st or 2nd environment.
• Connect the door, side panels, top and base panels of the control cabinet with the control
cabinet frame using one of the following methods:
– Electrical contact surface of several cm² for each contact location
– Several screwed connections
– Short, finely stranded, braided copper wires with cross-sections
• A shield support is provided for shielded cables that are routed out of the control cabinet.
• The PE rail and shield support should be connected to the control cabinet frame through a
large surface area to establish a good electrical connection.
• Devices and components are mounted on a bare, metal mounting plate.
SINAMICS G220 converter
Operating Instructions, 04/2024, FW V6.2, A5E51781573B AB
≥ 95 mm² / 000 (3/0) (‑2) AWG
Application planning
4.14 EMC-compliant installation
81

Advertisement

Table of Contents
loading

Table of Contents