Agilent Technologies Helium User Manual page 31

Leak detector
Table of Contents

Advertisement

Instructions for Use
Figure 10 Mobile Unit Oil Fill
Powering Up
1
Ensure that the roughing pump is switched on and if applicable (IDP-15), set to
the correct voltage setting.
2
Switch the leak detector on, cover the leak detector inlet with a blank-off cap
(provided and already in place), and wait for the screen to read System Ready
before operating.
Agilent Helium Leak Detector User Manual
31

Advertisement

Table of Contents
loading

Table of Contents