CHERY AUTOMOBILE CO., LTD
2. Right drive shaft's oil sealing;
3.
Put on left and right drive
shafts;
4.
Install two front wheels;
5
.Lower the vehicle.
Oil cooling pipe
D
isassembly procedure:
1.
Remove the battery;
2.
Place a oil box under the
vehicle to collect the oil;
3. Remove the clip connecting the
cooling pipe with the cooler.
4.
Remove the clip connecting the
cooling
pipe
transmission.
with
the
Automatic Transmission Fault Diagnosis Manual
57