3. GETTING STARTED

Throughout this chapter are various diagrams showing pneumatic connections
between the M400E and various other pieces of equipment such as calibrators and
zero air sources. These diagrams are only intended to be schematic
representations of these connections and do not reflect actual physical locations of
equipment and fitting location or orientation. Contact your regional EPA or other
appropriate governing agency for more detailed recommendations.

3.1. Unpacking and Initial Set Up

1. Verify that there is no apparent external shipping damage. If damage has
occurred, please advise the shipper first, then T-API.
2. Included with your analyzer is a printed record of the final performance
characterization performed on your instrument at the factory. This record is an
important quality assurance and calibration record for this instrument. It should
be placed in the quality records file for this instrument.
3. Carefully remove the top cover of the analyzer and check for internal shipping
damage.
Remove the set screw located in the top, center of the rear panel.
Remove the four screws fastening the top cover to the unit (two per side).
Lift the cover straight up. Do not slide backwards.
Some versions of the 400E O
Static sensitive parts are present on PCA (Printed Circuit
Assemblies). Before touching PCAs, touch a bare metal part of
the chassis to discharge any electrostatic potentials or connect a
P/N 04316 Rev: B
To avoid personal injury, always use two persons to lift and
carry the Model 400E.
fastener at the top center of the rear panel.
grounding strap to your wrist.
NOTE
CAUTION
NOTE
Analyzer may have a Phillips-Head
3
NOTE
Getting Started