Figure 2. Setting Up Equipment And Test Connector For The - Agilent Technologies 6000 Series Service Manual

Hide thumbs Also See for 6000 Series:
Table of Contents

Advertisement

2
Testing Performance
Oscilloscope
Calibrator
Digital
Multimeter
BNC-Banana
cable
34
BNC Tee
Test
Connector
Setting Up Equipment and Test Connector for the Threshold
Figure 2
Test
4 Use a BNC-banana cable to connect the multimeter to the
other side of the BNC Tee.
5 Connect the BNC Tee to the Channel 1 output of the
calibrator as shown in
6 On the oscilloscope, press the D15 Thru D0 key, then press the
Thresholds softkey, then press the D15 Thru D0 softkey
repeatedly until the check mark is next to User.
6000L Series Oscilloscope
6000A Series Oscilloscope
Channels
8 - 15
Channels
0 - 7
Channels
8 - 15
Channels
0 - 7
Figure
2.
6000 Series Oscilloscopes Service Guide
Probe
Cables

Advertisement

Table of Contents
loading

Table of Contents